Get a Free Quote
Questions? Call 908-647-0313

Leland Limited, South Plainfield, NJ

Back to Case Studies

Challenge

Leland Limited is a growing company located in South Plainfield New Jersey that specializes in disposable gas filled cylinders and assembles and test dozens of products for the aerospace industry.  Their primary markets are aerospace, medical, beverage, and the safety industries.  Leland Limited recently acquired a new building and began renovating one of their older ones.  They contacted The Mezzanine Company to see if we could assist them on this project by supplying a work platform for the newly renovated space.

Customizing a platform is always a challenge particularly when the space you are building it for has not been constructed yet.  The work platform was also going to need to be an exact fit as space was limited and we wanted to create the maximum amount possible.

Solution

To solve the challenges of designing a system for an uncompleted space we had our technicians make several site visits during the construction process to ensure that we had an accurate idea of what the area would look like once the renovations were completed.

Based on this information, and working with both the manufacturer and an independent engineer, we created PE stamped approval drawings for the new work platform.  These drawings also played an important part of the permit process with the town. This allowed Leland to expand their current work permit for the renovation to include the work platform also.

For us, the drawings allowed us to design the work platform to fit exactly between three walls.  To make this possible, we employed a series of cantilever arms along one wall to get all the space possible out of the area; approximately 240 square feet.  To handle the traffic necessary for this platform, we included an IBC regulation staircase.

We also worked closely with the manufacturer, Leland Limited, our shipping company, and our installer on this project, as the renovation took longer than originally anticipated. Because of this, we needed to keep in close communication with all parties to ensure that the scheduling for everything worked out. When the renovations were complete, our team was ready to set up the installation to get Leland Limited the product they needed at a time that worked for them.

Back to Case Studies

Get a Free Quote

It’s fast and easy! Complete our simple Quote Request form and we'll get back to you with pricing or a detailed proposal—your choice!
Get Started

Get a Free Quote

It’s fast and easy. Complete our Free Quote form, and we'll get back to you with pricing or a detailed proposal for your mezzanine project—your choice!
Get a Free Quote

Not Ready to Start a Project?

Keep in touch by subscribing to our monthly newsletter! Each month we’ll send you one email featuring a recent mezzanine project and any current promotions.
Sign Up Now
Mezzanine process

Join Our Monthly Newsletter

Sign up today and receive one email each month featuring a recent mezzanine project and any current promotions. We’ll respect your privacy!
Thanks for subscribing. We’ll send you our next newsletter soon!
Close Window
Oops! Something went wrong while submitting the form.