Challenge

In 2013, we worked with Colony Hardware todesign and engineer a 16,000 square foot mezzanine at their Orange, Connecticut location.Recently, they contacted us again to assist them on designing and providinganother storage platform for their expansion in the Bronx, New York.

Some of the challengesof this project would be:

  1. Theywere looking to gain the most amount of space possible, while staying withinthe limits of what their local building code would allow
  2. Theywanted the mezzanine to match up with two existing mezzanine structures in thebuilding
  3. Thismezzanine would be installed in an active warehouse and needed to be installedwith minimum interruption to their operations
  4. Theyneeded to incorporate a conveyor into the mezzanine to easily move boxes fromthe top of the mezzanine to the ground floor

Solution

We started by having our V.P. of project management schedulea site visit to their new location. Using their drawings and our findingsduring the site visit, we came up with a design for an approximately 3,500square foot structure. The mezzanine was designed to maximize their space,while staying within the limits of the building code.

Additionally, the mezzanine was designed to match up withthe existing mezzanine structures in the warehouse, so as to provide seamlessintegration with their existing space. We also provided two IBC staircases inorder to provide easy and safe access for their employees. To help provide safeaccess for the loading of materials on the mezzanine, we provided an overheadsafety gate.

We also provided a conveyor chute for the easytransportation of boxes from the top of the mezzanine to the ground floor. Themezzanine was custom designed to integrate with the conveyor chute.

Once the proposal was accepted, our project manager made numeroussite visits and made the final design adjustments. As the shipment date wasapproaching, we worked closely with Colony Hardware and our installation teamto target an ideal installation date. Once the mezzanine was delivered, ourinstallation team got right to work and installed the mezzanine with minimuminterruption to their operations.

Bob Balasco from Colony Hardware had this to say about TheMezzanine Company “From start to finish, TheMezzanine Company was always on top of things. Very responsive team, easy towork with, listened to our needs and requests and was always accommodating. Ourfacilities are extremely busy. It was necessary that your group worked aroundour schedule and stayed out of the way as we needed to be active in our warehouse.This was done easily; communication was always positive and productive”

Currently, we are assisting them with their expansion plans inthe Midwest. Stay tuned.

Back to Case Studies

Get a Free Quote

It’s fast and easy! Complete our simple Quote Request form and we'll get back to you with pricing or a detailed proposal—your choice!
Get Started

Get a Free Quote

It’s fast and easy. Complete our Free Quote form, and we'll get back to you with pricing or a detailed proposal for your mezzanine project—your choice!
Get a Free Quote

Not Ready to Start a Project?

Keep in touch by subscribing to our monthly newsletter! Each month we’ll send you one email featuring a recent mezzanine project and any current promotions.
Sign Up Now
Mezzanine process

Join Our Monthly Newsletter

Sign up today and receive one email each month featuring a recent mezzanine project and any current promotions. We’ll respect your privacy!
Thanks for subscribing. We’ll send you our next newsletter soon!
Close Window
Oops! Something went wrong while submitting the form.