Challenge

American Spraytech is an aerosol contract filler located in Branchburg, NJ. The Mezzanine Company has worked with American Spraytech in the past on several projects, ranging from storage rack to work platforms and office mezzanines, at a number of their facility locations.

American Spraytech was opening a new three-story facility, and once again, they called upon The Mezzanine Company for assistance. They needed to create an additional floor level above their compounding room area in order to gain easy access to their mixing tanks, and to stage materials.

Some of the complexities of the project were:

1. The mezzanine had to be located on the second floor of their facility.

2. The mezzanine would need to fit around the tanks to provide access from all angles.

3. The mezzanine had to match up with the 3rd floor of their building.

4. The mezzanine flooring needed to be suitable for heavy loading with pallet trucks as well as protection from any product spills.

Solution

The Mezzanine Company reviewed American Spraytech’s requirements and building space and provided a proposal for an approximately 3,100 square foot L-shaped mezzanine. The mezzanine was designed to match up exactly with the third floor of their building, and fit around some of the building’s structural supports.

In order to work around the tanks, the mezzanine was custom designed with several circular cutouts. It would enable them to have access from all around. The Mezzanine Company assisted with the tank layout and installed the mezzanine around the tanks after they were set in place.

For the flooring, heavy duty galvanized diamond plate was chosen to serve the customer's needs best and provide a surface requiring minimal maintenance.

During the design phase, a change in the tank layout required re-designing the entire steel structure. The Mezzanine Company worked quickly to coordinate and complete the updated design to proceed with production and maintain the planned delivery schedule.

Once the mezzanine was completed production and shipped to their facility, the materials were rigged up to the second floor of the building, and the installation began. As timing was critical, the crew worked diligently to complete, including through the Memorial Day holiday weekend.  It led to a successful and on-time completion of this part of their important project.

Back to Case Studies

Get a Free Quote

It’s fast and easy! Complete our simple Quote Request form and we'll get back to you with pricing or a detailed proposal—your choice!
Get Started

Get a Free Quote

It’s fast and easy. Complete our Free Quote form, and we'll get back to you with pricing or a detailed proposal for your mezzanine project—your choice!
Get a Free Quote

Not Ready to Start a Project?

Keep in touch by subscribing to our monthly newsletter! Each month we’ll send you one email featuring a recent mezzanine project and any current promotions.
Sign Up Now
Mezzanine process

Join Our Monthly Newsletter

Sign up today and receive one email each month featuring a recent mezzanine project and any current promotions. We’ll respect your privacy!
Thanks for subscribing. We’ll send you our next newsletter soon!
Close Window
Oops! Something went wrong while submitting the form.